concurrent.cd

“Engineers were breaking big features into reviewable pieces, which is the right instinct, but it regularly produced stacks of 20 PRs for a single project.”

— John Wang, Assembled · Findings from the productivity investigation

Quote · assembled.com

Read the source on assembled.com

From “Stacks of 20 PRs for a single project”, found 2026-10-16.

Take

Company data showing that how work is sliced, and how fast review is, decides what work gets attempted: "Fast, predictable review changed which work people attempted." A three-week window, the CTO's own post, and their own reviewer product.

AI-drafted